DMM Klettersteig 12mm Steel Screwgate Carabiner

 
, , ,

The Klettersteig shape takes the strength and volume increases of an Offset D and then extends them even further to give a high volume, super-strong connector.

RRP: £14.99

£13.99 Ex VAT

£16.79 Inc VAT

Stock: Available

4 in stock

Quantity:
SKU:   RIGG-DMM-0031
MPN: C842
Compare
Add to Wish List
Sale!

Description

The Klettersteig shape takes the strength and volume increases of an Offset D and then extends them even further to give a high volume, super-strong connector. The Klettersteig’s wide gate opening makes it particularly suitable for clipping oversize items, or simply allows ease of use in more normal situations.

Product Name Product Code Colour MBS (Major Axis) MBS (Minor Axis) MBS (Gate Open Dimensions Weight Gate Opening (X) Conformance
12mm Klettersteig Screwgate
C842

 

Light Gold
45kN
9kN
10kN
76 x 126mm
266g
24mm
EN 362:2004 B/T, EN EN12275:2013 B

Additional information

Weight 0.28 kg
Dimensions 1 × 1 × 1 cm
Brand

DMM

Screwgate

 

The Screwgate is the original, classic, double-action gate mechanism and is still the most secure mechanism in many situations. Despite it not being auto-locking, in the hands of a competent user they can offer many advantages over their auto-lock rivals. Screwgates can be unlocked, have the gate opened, a component clipped and then re-locked with one hand only. This can be crucial in some rope access situations for instance. To do all of this one-handed with an auto-locking connector is challenging to say the least. Even this classic design has undergone continuous evolution and our modern barrels feature a new screw knurled profile to assist gripping in wet or icy conditions as well as increased strengths. DMM have recently increased the thickness of the gate and thimble to improve the thimble/latch overlap, giving greater security especially across the minor axis (loading across the gate).

All of DMM's screwgates have an in-built limiter to stop the barrel from being over-tightened onto the nose when loaded. This can be especially dangerous when managing a casualty in a two person rescue as it can make escaping the system extremely problematic.

Top Tip: To prevent a screwgate from vibrating unlocked, simply invert it so that any downward movement vibrates it to the locked position.

 

Klettersteig connectors look and behave very similarly to Offset Ds, but are wider. This design helps maximise gate opening and internal working volume, whilst still allowing any loads to be located as close to the spine of the connector as possible. Klettersteig connectors must pass an additional test to any of the other connectors as they are often subjected to loads in sub-optimal orientations.

Every DMM product carries at least the minimum marking requirements as stipulated by CE norms.

This usually involves 2 distinct sets of markings:

Strength and Certification markings
These markings show the breaking strength of the product or component in various situations as well as relevant CE and instructional information. E.g. an alloy connector would show:

  • Gate Closed strength
  • Minor Axis strength
  • Gate Open strength
  • A ‘Read the instructions’ pictogram and the notified body number for quality management system and CE Mark.

Unique I.D. Markings

All DMM metal products carry a unique serial number. The number allows every single item to be individually traced back to its original date and order of production.

The way it works is as follows:

YRDAYXXXX#

YR Year of Manufacture
08 2008
09 2009
10 2010
11 2011
12 2012

DAY The day of the year on which the product was marked
004 would be the 4th of January
032 would be the 1st of February
344 would be the 10th of December

XXXX Individual serial number
0001 would be the first component marked on that day
0050 would be the fiftieth component marked during the day

# The machine with which the component was serialized
A = Rotary Laser Marker
B or M = Max Box Laser Marker
C = Dot Marker

Example: 081001450A

Yr 2008 Day 100 Serial Number 1450 Machine A

For us, Quality Assurance isn’t so much a process as a way of life. As users ourselves we know that when working at height, one’s safety system has to be up to the task, no if‘s or but’s, compromises or doubts as any failure could have catastrophic consequences. When working in an extreme environment you need to be focused on the job not worrying whether the gates on your connectors are going to stick.

In general, equipment fails as a result of misuse. It’s one thing meeting a standard or ‘norm‘, but quite another to ensure that the ultimate strength of each individual product is at least as high as both it’s rated strength and the requirements of a standard. At DMM we strive to build in sufficient reserves to be sure that each product delivers when put to the ultimate test. We achieve this through stringent controls at each stage of production.

Each operator is highly trained in the use of Statistical Process Control systems and on top of all the routine tests we run 3 sigma rating controls on each batch. Since all safety critical processes are carried out on site we are in a position to take appropriate preventative and corrective action immediately.

We are accredited to ISO:9001/2008. All products are CE certified and many are approved to CSA, ANSI Z359.1(07+09) NFPA, NATO.

Statistical Process Control
The statistical process control system that we have implemented over the years enables us to have absolute control over each individual stage of the production process. We then have a system of ongoing batch testing which monitors and ensures that our product strength is maintained and exceeded. Every machine operator carries out routine checks and measurements to ensure that their operation stays within its pre-defined tolerance levels.

CE Marking and Product Conformance
The CE marking process is known as Type Examination and is an important supplement to our Quality Management System. In line with the requirements of European Union Personal Protective Equipment (PPE) Directive 89/686/EEC all products designed and manufactured by DMM which are classified as PPE are independently type examined and tested to the relevant European Standard for Industrial Safety and Mountaineering. Only after meeting the requirements of the PPE Directive and the relevant European Standard are we allowed to mark 0120CE (the “CE ” mark) on our products.

ISO 9001:2008 compliance and CE marking/product conformance are monitored by CEN (Committee for European normalization. Notified Body No. 0120 (SGS UK Ltd., Weston-Super-Mare, Somerset, UK ). It is a legal requirement that we maintain our Quality Management System as part of the PPE Directive “CE ” marking process.

Statistical Quality Control
DMM were the first company to use a “3 Sigma” Statistical Quality Control (SQC ) technique to establish and monitor the strength ratings marked on products.

Meeting the standards is one thing, but our philosophy at DMM is to continue to improve the strengths of our products to exceed these requirements where possible. Using test data derived from destructive testing samples at the design stage, we can set the rated strength of the product with ‘3 standard deviations’ in reserve. This gives greater security in situations which might not be reflected in the standards but may happen in non-laboratory or misuse conditions.

Batch Production
Batch production means that components stay together throughout the manufacturing process from the moment the raw material is issued from the stores to the moment they pass through to final inspection. This ensures complete traceability from the purchase order for the raw material used through to when the product goes into our finished product stores.

Investors in People
DMM were the first manufacturing company in Wales to be registered to the II P standard (July 1992). In December 2006 we also surpassed all target requirements set out in to the latest version of this important standard. The Investors in People award is, as it’s name suggests, people orientated and its main objectives are:

(a) to develop strategies to improve the performance of the organisation through its people
(b) to ensure that the organisation takes action in order to improve its performance through its people and
(c) to evaluate the impact of this investment in people on the performance of the organisation.

II P is more than just a training system, the II P system is a key mechanism that helps us to target areas for improvement in all aspects of the business.

Environmental Policy
One of our continuous goals is to reduce our environmental footprint both locally and globally. Our Environmental Policy has been recognised by the Welsh Assembly Government as being the best in Wales for any manufacturer. We are committed to:

  • Maintaining 100% recycling of our product
  • Reducing our energy consumption
  • Reducing emissions from our factory site
  • Increasing the recycling of production, administrative and distribution by-products
  • Make a positive contribution to sustainable development



Reviews

Brands we work with...

VIEW ALL OF OUR BRANDS